Water for the Steel City, drawn from the Godavari and the Yeleru
VIWSCO conveys up to 12 TMC of raw water a year across 152.3 km of pipeline and canal — from the Godavari river and Yeleru Reservoir to industries and citizens across Greater Visakhapatnam.
TOTAL LENGTH: 152.3 KM
River Godavari
KM 0.0
5 TMC alloc.
Kateru Pump House
2600mm MS pipe
56.0 KM
Joins YLM Canal
at Yeleswaram
Ch. 1.20 KM
Yeleru Reservoir — 24.00 TMC (7 TMC alloc.)
Link Canal
5.4 KM
Water Supply Canal
33.6 KM
KBR (RINL)
KM 152.3
- Source / delivery point
- Conveyance infrastructure